Estimation of tool requirements in single-stage multimachine systems
From MaRDI portal
Publication:4245601
DOI10.1080/002075498193237zbMath0940.90550OpenAlexW2117962291MaRDI QIDQ4245601
Jose M. A. Tanchoco, Pyung-Hoi Koo, Joseph J. Talavage
Publication date: 19 July 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498193237
Related Items (2)
A methodology for cutting-tool management through the integration of CAPP and scheduling ⋮ The tooling system configuration in a new manufacturing system architecture
This page was built for publication: Estimation of tool requirements in single-stage multimachine systems