Managing batch processors to reduce lead time in a semiconductor packaging line
From MaRDI portal
Publication:4245219
DOI10.1080/002075497195623zbMath0949.90616OpenAlexW2153090004MaRDI QIDQ4245219
No author found.
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497195623
Related Items (9)
Dependence of lead time on batch size studied by a system dynamics model ⋮ An effective formulation for optimal scheduling of multistage multi-product batch plant based on due dates ⋮ Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem ⋮ Dynamic scheduling of batch servers with compatible product families ⋮ Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families ⋮ Dynamic scheduling of batch-processing machines with non-identical product sizes ⋮ Adaptive scheduling of batch servers in flow shops ⋮ Decentralised, multi-objective driven scheduling for reentrant shops: a conceptual development and a test case ⋮ A new dynamic look-ahead scheduling procedure for batching machines
This page was built for publication: Managing batch processors to reduce lead time in a semiconductor packaging line