Ewma charts for multivariate time series

From MaRDI portal
Revision as of 23:16, 6 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4346000


DOI10.1080/07474949708836378zbMath0883.62113MaRDI QIDQ4346000

H. G. Kramer, Wolfgang Schmid

Publication date: 23 March 1998

Published in: Sequential Analysis (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/07474949708836378


62M10: Time series, auto-correlation, regression, etc. in statistics (GARCH)

62P30: Applications of statistics in engineering and industry; control charts

65C05: Monte Carlo methods


Related Items

EWMA Charts for Monitoring the Mean and the Autocovariances of Stationary Gaussian Processes, Monitoring mean changes in persistent multivariate time series, Surveillance of the covariance matrix of multivariate nonlinear time series, Sequential monitoring of high‐dimensional time series, The effect of autocorrelation on the diagnostic procedures, A generalized exponentially weighted moving average control chart for monitoring autocorrelated vectors, Control charts for high-dimensional time series with estimated in-control parameters, CUSUM charts for monitoring the mean of a multivariate Gaussian process, EWMA charts for monitoring the mean and the autocovariances of stationary processes, The influence of parameter estimation on the ARL of Shewhart type charts for time series, Statistical surveillance of the mean vector and the covariance matrix of nonlinear time series, Control charts for multivariate spatial autoregressive models, Surveillance of non-stationary processes, Sequential monitoring of minimum variance portfolio, Quality surveillance with EWMA control charts based on exact control limits, Statistical Surveillance of the Parameters of a One-Factor Cox–Ingersoll–Ross Model, Optimal Surveillance Based on Exponentially Weighted Moving Averages, Properties and Use of the Shewhart Method and Its Followers, EWMA Control Charts for Monitoring Optimal Portfolio Weights, Multivariate Quality Control Chart for Autocorrelated Processes, Application of the Generalized Likelihood Ratio Test for Detecting Changes in the Mean of Multivariate GARCH Processes



Cites Work