Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
From MaRDI portal
Publication:4456055
DOI10.1002/nav.10045zbMath1044.90031MaRDI QIDQ4456055
Evrim D. Güneş, M. Selim Akturk, Jay B. Ghosh
Publication date: 15 March 2004
Published in: Naval Research Logistics (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/38104
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
Minimizing maximum tardiness in single FMS machine scheduling with tool changes, Operational methods for minimization of energy consumption of manufacturing equipment, Scheduling two parallel machines with machine-dependent availabilities, Minimizing total completion time on a single machine with a flexible maintenance activity, Scheduling with tool changes to minimize total completion time: Basic results and SPT performance, Scheduling with tool changes to minimize total completion time under controllable machining conditions, A note on worst-case performance of heuristics for maintenance scheduling problems, Supply chain scheduling problem in the hospital with periodic working time on a single machine, Job scheduling and management of wearing tools with stochastic tool lifetimes, Minimizing total flow time on a single flexible machine, Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time, Mixed integer programming formulations for two-machine flow shop scheduling with an availability constraint, Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance, Makespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies, The general two-level storage management problem: a reconsideration of the KTNS-rule, The tool transporter movements problem in flexible manufacturing systems, SINGLE MACHINE SCHEDULING WITH FORBIDDEN INTERVALS AND JOB DELIVERY TIMES