Non-identical parallel CNC machine scheduling
From MaRDI portal
Publication:4474693
DOI10.1080/0020754031000087184zbMath1052.90566MaRDI QIDQ4474693
M. Selim Akturk, Ayten Turkcan, Robert H. Storer
Publication date: 12 July 2004
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/24456
90B35: Deterministic scheduling theory in operations research
Related Items
A part-and-tool assignment method for the workload-balance between machines and the minimisation of tool-shortage occurrences in an FMS, A methodology for cutting-tool management through the integration of CAPP and scheduling, Due date and cost-based FMS loading, scheduling and tool management, Job scheduling and management of wearing tools with stochastic tool lifetimes, A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers, The general two-level storage management problem: a reconsideration of the KTNS-rule