Optimal scheduling of two-component products on a single facility
From MaRDI portal
Publication:4653447
DOI10.1080/00207720310001657072zbMath1060.90050OpenAlexW1994767973MaRDI QIDQ4653447
Publication date: 7 March 2005
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207720310001657072
Related Items (2)
A survey of scheduling problems with setup times or costs ⋮ On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems
Cites Work
- Containing groundwater contamination: Planning models using stochastic programming with recourse
- Scheduling the production of two-component jobs on a single machine
- Optimal Scheduling of Products with Two Subassemblies on a Single Machine
- Optimal scheduling of products with common and unique components
- Scheduling Groups of Jobs on a Single Machine
- Fabrication scheduling on a single machine with due date constraints
This page was built for publication: Optimal scheduling of two-component products on a single facility