Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed
From MaRDI portal
Publication:4661118
DOI10.1057/palgrave.jors.2601478zbMath1095.90543OpenAlexW2092182224MaRDI QIDQ4661118
Azizoglu, Meral, S. K. Koksalan, Murat M. Köksalan
Publication date: 4 April 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601478
Related Items (4)
MP or not MP: that is the question ⋮ Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs ⋮ A survey of single machine scheduling to minimize weighted number of tardy jobs ⋮ Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem
This page was built for publication: Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed