Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times

From MaRDI portal
Revision as of 17:05, 7 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4656697

DOI10.1057/palgrave.jors.2601390zbMath1130.90326OpenAlexW2018739257MaRDI QIDQ4656697

Marc Gravel, Caroline Gagné, Wilson L. Price

Publication date: 14 March 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601390




Related Items (26)

Ant colony systems for the single-machine total weighted earliness tardiness scheduling problemA study of hybrid evolutionary algorithms for single machine scheduling problem with sequence-dependent setup timesEfficient local search limitation strategy for single machine total weighted tardiness scheduling with sequence-dependent setup timesAn exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup timesAn ant colony optimization for single-machine tardiness scheduling with sequence-dependent setupsAn improved particle swarm optimization for selective single machine scheduling with sequence dependent setup costs and downstream demandsScatter search for minimizing weighted tardiness in a single machine scheduling with setupsA BB\&R algorithm for minimizing total tardiness on a single machine with sequence dependent setup timesIterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardinessNeighborhood search procedures for single machine tardiness scheduling with sequence-dependent setupsAlgorithms for single machine total tardiness scheduling with sequence dependent setupsMultiple colony ant algorithm for job-shop scheduling problemA GRASP based on DE to solve single machine scheduling problem with SDSTMultiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approachAnt colony optimization combined with taboo search for the job shop scheduling problemILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardinessA survey of scheduling problems with setup times or costsA hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup timesMakespan minimization on single batch-processing machine via ant colony optimizationA variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machineA heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup timesAnt colony optimization for continuous domainsA discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup timesScheduling of tasks with effectiveness precedence constraintsA unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problemsAnt colony optimization theory: a survey




This page was built for publication: Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times