A novel model for a manufacturing system with joint production lines in terms of prior-set
From MaRDI portal
Publication:5265608
DOI10.1080/00207721.2013.783947zbMath1316.93015OpenAlexW1996626473MaRDI QIDQ5265608
Publication date: 28 July 2015
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207721.2013.783947
different defect ratesjoint production linesmulti-state manufacturing network (MMN)prior-setreworking actions
Lua error in Module:PublicationMSCList at line 37: attempt to index local 'msc_result' (a nil value).
Cites Work
- Optimizing a production system with rework and equal sized batch shipments
- Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
- Reliability evaluation of a multistate network subject to time constraint under routing policy
- Measure the quality level for a supplier-demand system by a multicommodity stochastic-flow network
- Reliability Bounds for Multistate Systems with Multistate Components
- Maximising profits for an EPQ model with unreliable machine and rework of random defective items
- Revisiting revenue management for remanufactured products
This page was built for publication: A novel model for a manufacturing system with joint production lines in terms of prior-set