Solving the Production and Maintenance Optimization Problem by a Global Approach
From MaRDI portal
Publication:5357763
DOI10.1007/978-3-319-18167-7_27zbMath1370.90100MaRDI QIDQ5357763
Nidhal Rezg, Vinh Thanh Ho, Hoai An Le Thi, Zied Hajej
Publication date: 12 September 2017
Published in: Advances in Intelligent Systems and Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-18167-7_27
90C20: Quadratic programming
90B35: Deterministic scheduling theory in operations research
90B25: Reliability, availability, maintenance, inspection in operations research
90B30: Production models
90B05: Inventory, storage, reservoirs
90C09: Boolean programming
Cites Work
- Unnamed Item
- An efficient combined DCA and B\&B using DC/SDP relaxation for globally solving binary quadratic programs
- Using a mixed integer quadratic programming solver for the unconstrained quadratic \(0-1\) problem
- A decision optimization model for leased manufacturing equipment with warranty under forecasting production/maintenance problem
- Computational aspects of a branch and bound algorithm for quadratic zero- one programming
- Joint optimization of preventive maintenance and inventory control in a production line using simulation
- Joint optimal inventory control and preventive maintenance policy
- Impact of the Corrective Maintenance Cost on Manufacturing Remanufacturing System Performance