A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (Q869149)
From MaRDI portal
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness |
scientific article |
Statements
A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (English)
0 references
26 February 2007
0 references
combinatorial optimization
0 references
maximum tardiness
0 references
sequence-dependent setup
0 references
branch and bound
0 references
single machine schedule
0 references