Bilevel programming applied to the flow shop scheduling problem (Q1915962)

From MaRDI portal
Revision as of 12:56, 24 May 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Bilevel programming applied to the flow shop scheduling problem
scientific article

    Statements

    Bilevel programming applied to the flow shop scheduling problem (English)
    0 references
    0 references
    0 references
    1 July 1996
    0 references
    two level branch and bound
    0 references
    flow-shop scheduling
    0 references
    bilevel programming
    0 references
    total flowtime
    0 references
    makespan
    0 references

    Identifiers