Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. (Q4230046)
From MaRDI portal
scientific article; zbMATH DE number 1256413
Language | Label | Description | Also known as |
---|---|---|---|
English | Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. |
scientific article; zbMATH DE number 1256413 |
Statements
Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. (English)
0 references
1 March 1999
0 references
production planning
0 references
multiple-level, capacitated resource problem
0 references
just-in-time
0 references
economic lot scheduling
0 references
0 references
0 references