A methodology for cutting-tool management through the integration of CAPP and scheduling (Q5385471)

From MaRDI portal
Revision as of 09:30, 28 June 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article; zbMATH DE number 5271440
Language Label Description Also known as
English
A methodology for cutting-tool management through the integration of CAPP and scheduling
scientific article; zbMATH DE number 5271440

    Statements

    A methodology for cutting-tool management through the integration of CAPP and scheduling (English)
    0 references
    6 May 2008
    0 references
    0 references
    tool management
    0 references
    CAPP
    0 references
    scheduling
    0 references
    flexible manufacturing systems
    0 references
    0 references