Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost (Q2144217)

From MaRDI portal
Revision as of 04:11, 29 July 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
scientific article

    Statements

    Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost (English)
    0 references
    0 references
    0 references
    1 June 2022
    0 references
    Pareto-scheduling
    0 references
    parallel-batch machine
    0 references
    family jobs
    0 references
    ND agents
    0 references
    polynomial time
    0 references
    0 references
    0 references
    0 references

    Identifiers