Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (Q1357780)

From MaRDI portal
Revision as of 09:33, 30 July 2024 by Openalex240730090724 (talk | contribs) (Set OpenAlex properties.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)





scientific article
Language Label Description Also known as
English
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
scientific article

    Statements

    Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (English)
    0 references
    0 references
    0 references
    0 references
    16 June 1997
    0 references
    identical parallel machines
    0 references
    non-preemptive two-stage hybrid flow shop
    0 references
    maximum completion time
    0 references
    makespan
    0 references
    lower bounds
    0 references
    branch and bound
    0 references
    heuristics
    0 references

    Identifiers