Shrikant S. Panwalkar

From MaRDI portal
Revision as of 10:49, 6 October 2023 by Import231006081045 (talk | contribs) (Created automatically from import231006081045)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:1268194

Available identifiers

zbMath Open panwalkar.shrikant-sMaRDI QIDQ1268194

List of research outcomes





PublicationDate of PublicationType
Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines2020-03-10Paper
The evolution of schematic representations of flow shop scheduling problems2020-03-06Paper
Analysis of flow shop scheduling anomalies2019-09-09Paper
Scheduling research and the first decade of NRLQ: A historical perspective2019-05-02Paper
On equivalence between the proportionate flow shop and single‐machine scheduling problems2019-05-02Paper
A note on combined job selection and sequencing problems2019-03-26Paper
Review of the ordered and proportionate flow shop scheduling research2019-03-05Paper
The proportionate two-machine no-wait job shop scheduling problem2016-10-07Paper
The two-machine no-wait general and proportionate open shop makespan problem2016-06-23Paper
A note on the complexity of scheduling problems with linear job deterioration2015-06-22Paper
Proportionate flow shop: New complexity results and models with due date assignment2015-05-06Paper
An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines2012-12-29Paper
Common due window size and location determination in a single machine scheduling problem2005-01-19Paper
Determination of common due window location in a single machine scheduling problem1998-10-18Paper
A single machine scheduling problem with common due window and controllable processing times1997-12-04Paper
A heuristic for the single machine tardiness problem1994-02-28Paper
Single Stage Minimum Absolute Lateness Problem with a Common Due Date on Non-Identical Machines1993-08-23Paper
The Lessons of Flowshop Scheduling Research1992-06-28Paper
Scheduling of a Two-machine Flowshop with Travel Time Between Machines1991-01-01Paper
Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem1982-01-01Paper
Analysis of the left tail for the makespan distribution in flow-shop problems1981-01-01Paper
Counterexamples to optimal permutation schedules for certain flow shop problems1981-01-01Paper
Ordered Flow Shop Problems with no In-Process Waiting: Further Results1980-01-01Paper
An Ordered Flow Shop Sequeneing Problem With TWK Type Due Dates and Total Tardiness Criterion1979-01-01Paper
Flow Shop Scheduling Problems with No In-Process Waiting: A Special Case1979-01-01Paper
A Survey of Scheduling Rules1977-01-01Paper
A convex property of an ordered flow shop sequencing problem1977-01-01Paper
Flowshop sequencing problem with ordered processing time matrices: A general case1976-01-01Paper
Flowshop Sequencing Problem with Ordered Processing Time Matrices1975-01-01Paper
An improved branch and bound procedure forn ×m flow shop problems1975-01-01Paper
https://portal.mardi4nfdi.de/entity/Q32129091973-01-01Paper
Job Shop Sequencing Problem on Two Machines with Time Lag Constraints1973-01-01Paper
Parametric analysis of linear programs with upper bounded variables1973-01-01Paper

Research outcomes over time

This page was built for person: Shrikant S. Panwalkar