Publication | Date of Publication | Type |
---|
Short‐term scheduling with machine calibration | 2023-11-29 | Paper |
Scheduling with day shifts and breaks | 2023-11-20 | Paper |
Single machine scheduling problem with a flexible maintenance revisited | 2021-07-08 | Paper |
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT | 2019-02-28 | Paper |
Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time | 2018-11-07 | Paper |
Makespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies | 2018-10-10 | Paper |
Single-machine scheduling with workload-dependent maintenance duration to minimize maximum lateness | 2018-08-27 | Paper |
Mixed integer programming formulations for two-machine flow shop scheduling with an availability constraint | 2018-06-14 | Paper |
Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities | 2018-06-13 | Paper |
Single machine scheduling problem with two synergetic agents and piece-rate maintenance | 2016-12-07 | Paper |
Scheduling two parallel machines with machine-dependent availabilities | 2016-11-17 | Paper |
Notes on ``Scheduling problems with general effects of deterioration and learning | 2012-10-10 | Paper |
Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine | 2012-04-22 | Paper |
Erratum to ``Single-machine scheduling problems with both deteriorating jobs and learning effects [Appl. Math. Modelling 34 (2010) 2831-2839] | 2011-12-18 | Paper |
Erratum to ``Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects [Appl. Math. Modelling 35 (2011) 1388-1395] | 2011-12-18 | Paper |
Generalized intuitionistic fuzzy ideals of ordered semigroups | 2011-11-22 | Paper |
Notes on ``Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning | 2011-11-11 | Paper |
Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times | 2011-09-16 | Paper |
Notes on ``A bicriteria flowshop scheduling with a learning effect | 2011-09-16 | Paper |
Comments on ``A bicriteria parallel machine scheduling with a learning effect of setup and removal times | 2011-09-16 | Paper |
Erratum to ``minimizing total tardiness in a scheduling problem with a learning effect [Appl. Math. model. 31 (2007) 1351-1361] | 2011-09-16 | Paper |
Notes on ``Some single-machine scheduling problems with general position-dependent and time-dependent learning effects | 2011-06-22 | Paper |
Comments on ``A bicriteria flowshop scheduling problem with setup times | 2011-04-19 | Paper |
Some single-machine scheduling problems with general effects of learning and deterioration | 2011-03-19 | Paper |
Single-machine scheduling with a general sum-of-actual-processing-times-based and job-position-based learning effect | 2010-12-14 | Paper |
The \((\in,\in\!\vee q)\)-fuzzy subsemigroups and ideals of an \((\in,\in\!\vee q)\)-fuzzy semigroup. | 2010-11-05 | Paper |
Comments on ``A note on minimizing maximum lateness in an \(m\)-machine scheduling problem with a learning effect | 2010-10-25 | Paper |
Scheduling jobs under increasing linear machine maintenance time | 2010-10-08 | Paper |
The \(L\)-fuzzy hypermodules. | 2010-06-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q5193105 | 2009-08-10 | Paper |
Some scheduling problems with general position-dependent and time-dependent learning effects | 2009-07-22 | Paper |
A note on ``scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan | 2009-04-30 | Paper |
Makespan minimization for two parallel machines scheduling with a periodic availability constraint | 2009-02-12 | Paper |
Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan | 2008-09-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q5455996 | 2008-04-04 | Paper |