Dehua Xu

From MaRDI portal
Revision as of 14:15, 6 October 2023 by Import231006081045 (talk | contribs) (Created automatically from import231006081045)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:342362

Available identifiers

zbMath Open xu.dehuaWikidataQ87209574 ScholiaQ87209574MaRDI QIDQ342362

List of research outcomes

PublicationDate of PublicationType
Short‐term scheduling with machine calibration2023-11-29Paper
Scheduling with day shifts and breaks2023-11-20Paper
Single machine scheduling problem with a flexible maintenance revisited2021-07-08Paper
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT2019-02-28Paper
Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time2018-11-07Paper
Makespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies2018-10-10Paper
Single-machine scheduling with workload-dependent maintenance duration to minimize maximum lateness2018-08-27Paper
Mixed integer programming formulations for two-machine flow shop scheduling with an availability constraint2018-06-14Paper
Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities2018-06-13Paper
Single machine scheduling problem with two synergetic agents and piece-rate maintenance2016-12-07Paper
Scheduling two parallel machines with machine-dependent availabilities2016-11-17Paper
Notes on ``Scheduling problems with general effects of deterioration and learning2012-10-10Paper
Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine2012-04-22Paper
Erratum to ``Single-machine scheduling problems with both deteriorating jobs and learning effects [Appl. Math. Modelling 34 (2010) 2831-2839]2011-12-18Paper
Erratum to ``Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects [Appl. Math. Modelling 35 (2011) 1388-1395]2011-12-18Paper
Generalized intuitionistic fuzzy ideals of ordered semigroups2011-11-22Paper
Notes on ``Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning2011-11-11Paper
Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times2011-09-16Paper
Notes on ``A bicriteria flowshop scheduling with a learning effect2011-09-16Paper
Comments on ``A bicriteria parallel machine scheduling with a learning effect of setup and removal times2011-09-16Paper
Erratum to ``minimizing total tardiness in a scheduling problem with a learning effect [Appl. Math. model. 31 (2007) 1351-1361]2011-09-16Paper
Notes on ``Some single-machine scheduling problems with general position-dependent and time-dependent learning effects2011-06-22Paper
Comments on ``A bicriteria flowshop scheduling problem with setup times2011-04-19Paper
Some single-machine scheduling problems with general effects of learning and deterioration2011-03-19Paper
Single-machine scheduling with a general sum-of-actual-processing-times-based and job-position-based learning effect2010-12-14Paper
The \((\in,\in\!\vee q)\)-fuzzy subsemigroups and ideals of an \((\in,\in\!\vee q)\)-fuzzy semigroup.2010-11-05Paper
Comments on ``A note on minimizing maximum lateness in an \(m\)-machine scheduling problem with a learning effect2010-10-25Paper
Scheduling jobs under increasing linear machine maintenance time2010-10-08Paper
The \(L\)-fuzzy hypermodules.2010-06-28Paper
https://portal.mardi4nfdi.de/entity/Q51931052009-08-10Paper
Some scheduling problems with general position-dependent and time-dependent learning effects2009-07-22Paper
A note on ``scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan2009-04-30Paper
Makespan minimization for two parallel machines scheduling with a periodic availability constraint2009-02-12Paper
Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan2008-09-01Paper
https://portal.mardi4nfdi.de/entity/Q54559962008-04-04Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Dehua Xu