Pages that link to "Item:Q1010284"
From MaRDI portal
The following pages link to Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound (Q1010284):
Displaying 13 items.
- A job-shop scheduling approach for optimising sugarcane rail operations (Q656056) (← links)
- Solving an integrated job-shop problem with human resource constraints (Q744642) (← links)
- Constraint programming and operations research (Q1616390) (← links)
- Integrating employee timetabling with scheduling of machines and transporters in a job-shop environment: a mathematical formulation and an anarchic society optimization algorithm (Q1652317) (← links)
- A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals (Q1753439) (← links)
- A cutting plane approach for integrated planning and scheduling (Q1761978) (← links)
- A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions (Q2029954) (← links)
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers (Q2030539) (← links)
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems (Q2327625) (← links)
- Optimization of the integrated problem of employee timetabling and job shop scheduling (Q2669607) (← links)
- A project scheduling problem with periodically aggregated resource-constraints (Q2669745) (← links)
- A branch-and-bound procedure for forest harvest scheduling problems addressing aspects of habitat availability (Q2862159) (← links)
- A classification scheme for integrated staff rostering and scheduling problems (Q5247703) (← links)