Pages that link to "Item:Q1121790"
From MaRDI portal
The following pages link to Bounding the expected time-cost curve for a stochastic PERT network from below (Q1121790):
Displayed 3 items.
- A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing (Q833427) (← links)
- Sample-path optimization of convex stochastic performance functions (Q1363424) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)