Pages that link to "Item:Q1130028"
From MaRDI portal
The following pages link to Multiple and bicriteria scheduling: A literature survey (Q1130028):
Displayed 32 items.
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria (Q850236) (← links)
- An exact parallel method for a bi-objective permutation flowshop problem (Q857297) (← links)
- Parallel partitioning method (PPM): A new exact method to solve bi-objective problems (Q869006) (← links)
- Bicriterion scheduling with equal processing times on a batch processing machine (Q947947) (← links)
- A bicriteria two-machine permutation flowshop problem (Q1296104) (← links)
- The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure. (Q1410335) (← links)
- Minimizing makespan subject to minimum total flow-time on identical parallel machines (Q1580983) (← links)
- A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness (Q1765532) (← links)
- Minimizing total completion time and total deviation of job completion times from a restrictive due-date (Q1776951) (← links)
- A bicriteria approach to the two-machine flow shop scheduling problem (Q1807949) (← links)
- Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation (Q1847225) (← links)
- An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem (Q1848361) (← links)
- Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic (Q1848643) (← links)
- Using genetic algorithms for single-machine bicriteria scheduling problems (Q1869489) (← links)
- Makespan minimization subject to flowtime optimality on identical parallel machines (Q1885968) (← links)
- A combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problem (Q1919850) (← links)
- Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs (Q2378377) (← links)
- Heuristic for a new multiobjective scheduling problem (Q2463826) (← links)
- Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs (Q2566704) (← links)
- Genetic local search for multi-objective flowshop scheduling problems (Q2566706) (← links)
- Bicriteria train scheduling for high-speed passenger railroad planning applications (Q2566708) (← links)
- Pareto and scalar bicriterion optimization in scheduling deteriorating jobs (Q2566940) (← links)
- Multicriteria scheduling problems: a survey (Q2773166) (← links)
- Two-machine open shop scheduling with secondary criteria (Q3044040) (← links)
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem (Q3541175) (← links)
- (Q4212972) (← links)
- (Q4934193) (← links)
- A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness (Q5431617) (← links)
- Flowshop-scheduling problems with makespan criterion: a review (Q5466734) (← links)
- Minimizing makespan subject to minimum flowtime on two identical parallel machines (Q5939974) (← links)
- Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry (Q5954825) (← links)
- Local search heuristics for two-stage flow shop problems with secondary criterion (Q5955475) (← links)