Pages that link to "Item:Q1266547"
From MaRDI portal
The following pages link to Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (Q1266547):
Displaying 50 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- MIP models for resource-constrained project scheduling with flexible resource profiles (Q297247) (← links)
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers (Q339938) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- Scheduling modular projects on a bottleneck resource (Q398901) (← links)
- Resource constraint scheduling with a fractional shared resource (Q408404) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Project scheduling with flexible resources: formulation and inequalities (Q443821) (← links)
- An iterated local search algorithm for a place scheduling problem (Q474475) (← links)
- Multi-project scheduling with two-stage decomposition (Q490148) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Explaining the \texttt{cumulative} propagator (Q647477) (← links)
- Tri-directional scheduling scheme: theory and computation (Q655202) (← links)
- Event-based MILP models for resource-constrained project scheduling problems (Q709100) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (Q781900) (← links)
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis (Q817121) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- Simple heuristics for scheduling with limited intermediate storage (Q868994) (← links)
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (Q872245) (← links)
- A branch and bound method for the job-shop problem with sequence-dependent setup times (Q940884) (← links)
- Solving the resource-constrained project scheduling problem using filter-and-fan approach (Q945251) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- Scheduling tests in automotive R\&D projects (Q954930) (← links)
- Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms (Q990459) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- A priority-rule method for project scheduling with work-content constraints (Q1046055) (← links)
- PSPLIB -- a project scheduling problem library (Q1278481) (← links)
- Distribution requirements and compactness constraints in school timetabling (Q1291590) (← links)
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. (Q1399573) (← links)
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search. (Q1427560) (← links)
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (Q1590044) (← links)
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling (Q1590045) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- An adaptive large neighborhood search for the full truckload pickup and delivery problem with resource synchronization (Q1651513) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources (Q1667401) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- Modeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networks (Q1694207) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)