Pages that link to "Item:Q1266548"
From MaRDI portal
The following pages link to An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem (Q1266548):
Displaying 24 items.
- An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration (Q319357) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Approximability results for the resource-constrained project scheduling problem with a single type of resources (Q744638) (← links)
- Linear programming based algorithms for preemptive and non-preemptive RCPSP (Q884023) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- On project scheduling problem (Q1003084) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- On linear lower bounds for the resource constrained project scheduling problem. (Q1399576) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- The preemptive stochastic resource-constrained project scheduling problem (Q1735185) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers (Q2076410) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Resource constrained project scheduling subject to due dates: preemption permitted with penalty (Q2248711) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- Pre-emption in resource-constrained project scheduling (Q2482791) (← links)