Pages that link to "Item:Q1278813"
From MaRDI portal
The following pages link to Combinatorial optimization models for production scheduling in automated manufacturing systems (Q1278813):
Displayed 12 items.
- Production planning problems in printed circuit board assembly (Q697574) (← links)
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (Q703937) (← links)
- On a special case of the quadratic assignment problem with an application to storage-and-retrieval devices (Q817149) (← links)
- Scheduling dual gripper robotic cell: one-unit cycles (Q817550) (← links)
- Sequencing and scheduling in robotic cells: recent developments (Q880509) (← links)
- The tool switching problem revisited (Q881565) (← links)
- Cyclic scheduling in 3-machine robotic flow shops (Q1283916) (← links)
- Cyclic scheduling in a robotic production line (Q1347600) (← links)
- Minimizing flow time in cyclic schedules for identical jobs with acyclic precedence: The bottleneck lower bound. (Q1400347) (← links)
- Resolution of a scheduling problem in a flowshop robotic cell (Q1887770) (← links)
- A genetic approach to solving the problem of cyclic job shop scheduling with linear constraints (Q1887774) (← links)
- Storage management of items in two levels of availability (Q1969867) (← links)