Pages that link to "Item:Q1291587"
From MaRDI portal
The following pages link to A hybrid two-stage flowshop with part family, batch production, major and minor set-ups (Q1291587):
Displaying 11 items.
- Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling (Q300062) (← links)
- A two-stage hybrid flowshop with uniform machines and setup times (Q969780) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines (Q1767900) (← links)
- Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approach (Q2158042) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines (Q2456642) (← links)
- The significance of reducing setup times/setup costs (Q2467248) (← links)
- Group technology in a hybrid flowshop environment: a case study (Q2484361) (← links)
- Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints (Q6109801) (← links)