Pages that link to "Item:Q1296001"
From MaRDI portal
The following pages link to Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system (Q1296001):
Displaying 6 items.
- Supply chain models for an assembly system with preprocessing of raw materials (Q877051) (← links)
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990) (← links)
- Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm (Q1042216) (← links)
- Performance analysis of a kitting process in stochastic assembly systems (Q1886849) (← links)
- Optimal supply planning in MRP environments for assembly systems with random component procurement times (Q3541192) (← links)
- Generalized newsboy model to compute the optimal planned lead times in assembly systems (Q4706334) (← links)