Pages that link to "Item:Q1302719"
From MaRDI portal
The following pages link to A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem (Q1302719):
Displaying 23 items.
- Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem (Q282252) (← links)
- A branch-and-bound algorithm for single machine scheduling with quadratic earliness and tardiness penalties (Q339632) (← links)
- EA/G-GA for single machine scheduling problems with earliness/tardiness costs (Q400876) (← links)
- Generating artificial chromosomes with probability control in genetic algorithm for machine scheduling problems (Q613776) (← links)
- A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem (Q835579) (← links)
- A hybrid genetic algorithm with dominance properties for single machine scheduling with dependent penalties (Q838299) (← links)
- Minimizing total earliness and tardiness on a single machine using a hybrid heuristic (Q878591) (← links)
- An exact approach to early/tardy scheduling with release dates (Q1781563) (← links)
- Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties (Q1848363) (← links)
- A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time (Q1885972) (← links)
- Improved heuristics for the early/tardy scheduling problem with no idle time (Q1886859) (← links)
- An exact algorithm for single-machine scheduling without machine idle time (Q2268522) (← links)
- Scheduling just-in-time part supply for mixed-model assembly lines (Q2275595) (← links)
- Modeling single machine preemptive scheduling problems for computational efficiency (Q2288995) (← links)
- Bi-objective single machine scheduling problem with stochastic processing times (Q2343079) (← links)
- Minimizing earliness and tardiness costs in stochastic scheduling (Q2356252) (← links)
- Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness (Q2450493) (← links)
- Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties (Q2483517) (← links)
- Heuristic dispatching rule to maximize TDD and IDD performance (Q4671362) (← links)
- A HYBRID GENETIC ALGORITHM FOR THE EARLY/TARDY SCHEDULING PROBLEM (Q5487850) (← links)
- Counting and enumeration complexity with application to multicriteria scheduling (Q5920490) (← links)
- Just‐in‐time scheduling problem with due windows and release dates for precast bridge girders (Q6195034) (← links)
- INEH-VNS algorithm solved automatic production system scheduling problem under just-in-time environment (Q6535663) (← links)