Pages that link to "Item:Q1303708"
From MaRDI portal
The following pages link to Heuristics for the flow line problem with setup costs (Q1303708):
Displaying 12 items.
- Efficient constructive and composite heuristics for the permutation flowshop to minimise total earliness and tardiness (Q342504) (← links)
- General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (Q497626) (← links)
- Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. (Q1406627) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)
- Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling (Q2286871) (← links)
- Packing items to feed assembly lines (Q2384618) (← links)
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives (Q2467260) (← links)
- A bi-objective coordination setup problem in a two-stage production system (Q2482750) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- Assembly flowshop scheduling problem: speed-up procedure and computational evaluation (Q2670518) (← links)
- Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup (Q3621499) (← links)