Pages that link to "Item:Q1309970"
From MaRDI portal
The following pages link to Two-machine group scheduling problem with blocking and anticipatory setups (Q1309970):
Displaying 14 items.
- A bicriteria flowshop scheduling problem with setup times (Q865584) (← links)
- Efficient solutions to the cell-formation problem with multiple routings via a double-loop genetic algorithm (Q1296654) (← links)
- Total flowtime in no-wait flowshops with separated setup times. (Q1406685) (← links)
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. (Q1420383) (← links)
- A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups (Q1577472) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem (Q1736622) (← links)
- Mixed integer linear programming models for flow shop scheduling with a demand plan of job types (Q2303310) (← links)
- A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups (Q2496029) (← links)
- Group scheduling on two cells with intercell movement (Q2563903) (← links)
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups (Q2565776) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- Flowshop-scheduling problems with makespan criterion: a review (Q5466734) (← links)
- A new heuristic and dominance relations for no-wait flowshops with setups (Q5936136) (← links)