Pages that link to "Item:Q1310022"
From MaRDI portal
The following pages link to Performance of scheduling algorithms for no-wait flowshops with parallel machines (Q1310022):
Displaying 11 items.
- A cutting and scheduling problem in float glass manufacturing (Q398905) (← links)
- Some no-wait shops scheduling problems: Complexity aspect (Q1079487) (← links)
- A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage. (Q1410327) (← links)
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints. (Q1413824) (← links)
- The hot strip mill production scheduling problem: A tabu search approach (Q1609896) (← links)
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility (Q1698061) (← links)
- Clustering and genetic algorithm based hybrid flowshop scheduling with multiple operations (Q1717811) (← links)
- Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines (Q1767900) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- Scheduling semiconductor in-line steppers in new product/process introduction scenarios (Q3163705) (← links)
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time (Q4230171) (← links)