Pages that link to "Item:Q1331612"
From MaRDI portal
The following pages link to A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes (Q1331612):
Displaying 6 items.
- A heuristic approach for determining lot sizes and schedules using power-of-two policy (Q933870) (← links)
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes (Q1331612) (← links)
- Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems (Q1725606) (← links)
- A genetic algorithm for solving the economic lot scheduling problem in flow shops (Q3518466) (← links)
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. (Q5928378) (← links)
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic (Q5945322) (← links)