Pages that link to "Item:Q1341394"
From MaRDI portal
The following pages link to Two-machine ordered flowshop scheduling under random breakdowns (Q1341394):
Displayed 11 items.
- Minimizing makespan for scheduling stochastic job shop with random breakdown (Q388592) (← links)
- On stochastic machine scheduling with general distributional assumptions (Q1291772) (← links)
- Scheduling in stochastic flowshops with independent setup, processing and removal times (Q1366705) (← links)
- Stochastically minimizing total flowtime in flowshops with no waiting space (Q1806645) (← links)
- Schedule execution for two-machine flow-shop with interval processing times (Q2390053) (← links)
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures (Q2475628) (← links)
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness (Q2563893) (← links)
- Johnson's problem with stochastic processing times and optimal service level (Q2572849) (← links)
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times (Q3163137) (← links)
- Two-machine flowshop minimum-length scheduling problem with random and bounded processing times (Q4806914) (← links)
- Uncertain flexible flow shop scheduling problem subject to breakdowns (Q5275883) (← links)