Pages that link to "Item:Q1342015"
From MaRDI portal
The following pages link to Constrained multi-project planning problems: A Lagrangean decomposition approach (Q1342015):
Displaying 8 items.
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- Optimization analysis for design and planning of multi-project programs (Q1296112) (← links)
- Maximal covering code multiplexing access telecommunication networks (Q1876173) (← links)
- A learning-based optimization approach to multi-project scheduling (Q2018943) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)