Pages that link to "Item:Q1348546"
From MaRDI portal
The following pages link to Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications (Q1348546):
Displayed 8 items.
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times (Q879286) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application (Q2571194) (← links)
- A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times (Q2572851) (← links)
- Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests (Q2583511) (← links)
- Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm (Q3430246) (← links)
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times (Q3430247) (← links)
- Flowshop-scheduling problems with makespan criterion: a review (Q5466734) (← links)