Pages that link to "Item:Q1357784"
From MaRDI portal
The following pages link to Optimal level schedules for mixed-model, multi-level just-in-time assembly systems (Q1357784):
Displaying 16 items.
- Level scheduling under limited resequencing flexibility (Q539476) (← links)
- An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain (Q877048) (← links)
- Solving symmetric mixed-model multi-level just-in-time scheduling problems (Q968134) (← links)
- Level scheduling for batched JIT supply (Q973058) (← links)
- Sequencing mixed-model assembly lines: survey, classification and model critique (Q1011163) (← links)
- The product rate variation problem and its relevance in real world mixed-model assembly lines (Q1015006) (← links)
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging (Q1278361) (← links)
- A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process (Q1341405) (← links)
- The maximum deviation just-in-time scheduling problem. (Q1421459) (← links)
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines (Q1590816) (← links)
- Advanced constraint propagation for the combined car sequencing and level scheduling problem (Q1782169) (← links)
- Fair task allocation problem (Q2288963) (← links)
- A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines (Q2566705) (← links)
- Output Rate Variation Problem: Some Heuristic Paradigms and Dynamic Programming (Q2974712) (← links)
- An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal (Q3163160) (← links)
- (Q3388238) (← links)