Pages that link to "Item:Q1372766"
From MaRDI portal
The following pages link to An exact algorithm for project scheduling with multiple modes (Q1372766):
Displaying 45 items.
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (Q707776) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- Skilled workforce scheduling in service centres (Q954927) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (Q1296105) (← links)
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. (Q1399573) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Solving a multi-resource partial-ordering flexible variant of the job-shop scheduling problem with hybrid ASP (Q2055805) (← links)
- Optimizing resource-constrained project scheduling problem considering the reliability function (Q2163632) (← links)
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (Q2218447) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times (Q2467268) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (Q2519076) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)