Pages that link to "Item:Q1383140"
From MaRDI portal
The following pages link to Job shop scheduling with group-dependent setups, finite buffers, and long time horizon (Q1383140):
Displayed 11 items.
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times (Q850231) (← links)
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness (Q864814) (← links)
- A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (Q869149) (← links)
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times (Q941547) (← links)
- Optimizing memory allocation for multistage scheduling including setup times (Q1702728) (← links)
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions (Q1772851) (← links)
- An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns (Q3055224) (← links)
- Scheduling job shop problems with sequence-dependent setup times (Q3055268) (← links)
- A new Lagrangian Relaxation Algorithm for scheduling dissimilar parallel machines with release dates (Q3102810) (← links)
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times (Q3163716) (← links)
- Steel-making process scheduling using Lagrangian relaxation (Q4443361) (← links)