Pages that link to "Item:Q1399596"
From MaRDI portal
The following pages link to Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. (Q1399596):
Displaying 14 items.
- NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness (Q337554) (← links)
- A bicriteria flowshop scheduling problem with setup times (Q865584) (← links)
- Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling (Q870153) (← links)
- An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem (Q875429) (← links)
- Minimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristics (Q941559) (← links)
- A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria (Q954034) (← links)
- Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines (Q962838) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives (Q2467260) (← links)
- A bicriteria scheduling with sequence-dependent setup times (Q2506355) (← links)
- Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem (Q2669708) (← links)
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem (Q3541175) (← links)
- Modeling and analysis of multiobjective lot splitting for <i>N</i> -product <i>M</i> -machine flowshop lines (Q3560225) (← links)
- A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs (Q6048180) (← links)