Pages that link to "Item:Q1410333"
From MaRDI portal
The following pages link to A fuzzy robust scheduling approach for product development projects. (Q1410333):
Displaying 15 items.
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- A heuristic method for RCPSP with fuzzy activity times (Q621664) (← links)
- A possibilistic decision model for new product supply chain design (Q856295) (← links)
- Developing a heuristic algorithm for order production planning using network models under uncertainty conditions (Q858779) (← links)
- Product concept and prototype flexibility in manufacturing: Implications for customer satisfaction (Q953437) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- Coevolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop (Q1677019) (← links)
- Optimal computing budget allocation for ordinal optimization in solving stochastic job shop scheduling problems (Q1718781) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- A fuzzy robustness measure for the scheduling of commissioned product development projects (Q2036560) (← links)
- Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks (Q2336948) (← links)
- Disruption management in flight gate scheduling (Q5422016) (← links)
- Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty (Q6094564) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks (Q6109311) (← links)