Pages that link to "Item:Q1413925"
From MaRDI portal
The following pages link to Approximability of two-machine no-wait flowshop scheduling with availability constraints. (Q1413925):
Displaying 12 items.
- Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate (Q337585) (← links)
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints (Q356114) (← links)
- A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints (Q628666) (← links)
- Heuristics for two-machine flowshop scheduling with setup times and an availability constraint (Q850314) (← links)
- An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraint (Q878557) (← links)
- Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics (Q1017464) (← links)
- \(\frac{3}{2}\)-approximation for two-machine no-wait flowshop scheduling with availability constraints (Q1029003) (← links)
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility (Q1698061) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- Coordinated optimization of production scheduling and maintenance activities with machine reliability deterioration (Q2171074) (← links)
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach (Q2241323) (← links)