Pages that link to "Item:Q1420378"
From MaRDI portal
The following pages link to Minimizing the makespan for the flow shop scheduling problem with availability constraints. (Q1420378):
Displaying 18 items.
- Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate (Q337585) (← links)
- Solving an integrated job-shop problem with human resource constraints (Q744642) (← links)
- Heuristics for two-machine flowshop scheduling with setup times and an availability constraint (Q850314) (← links)
- Considering scheduling and preventive maintenance in the flowshop sequencing problem (Q883296) (← links)
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- Computing lower and upper bounds for a large-scale industrial job shop scheduling problem (Q1011298) (← links)
- Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics (Q1017464) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Multiobjective optimization for complex flexible job-shop scheduling problems (Q2239940) (← links)
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach (Q2241323) (← links)
- Mixed integer linear programming models for flow shop scheduling with a demand plan of job types (Q2303310) (← links)
- Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times (Q2456641) (← links)
- An approach for integrated scheduling and lot-sizing (Q2490158) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Scheduling Resources for Throughput Maximization (Q3088087) (← links)
- Incorporating preventive maintenance into the <i>m</i>-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study (Q5058979) (← links)
- The parallel AGV scheduling problem with battery constraints: a new formulation and a matheuristic approach (Q6109805) (← links)