Pages that link to "Item:Q1420383"
From MaRDI portal
The following pages link to Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. (Q1420383):
Displaying 12 items.
- An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers (Q947958) (← links)
- A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times (Q1046715) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Differential evolution metaheuristics for distributed limited-buffer flowshop scheduling with makespan criterion (Q2003413) (← links)
- Steelmaking-continuous casting scheduling problem with multi-position refining furnaces under time-of-use tariffs (Q2115759) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers (Q2475841) (← links)
- An effective hybrid genetic algorithm for flow shop scheduling with limited buffers (Q2489134) (← links)
- An approach for integrated scheduling and lot-sizing (Q2490158) (← links)
- A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups (Q2642312) (← links)
- Scheduling semiconductor in-line steppers in new product/process introduction scenarios (Q3163705) (← links)
- A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE (Q3638708) (← links)