Pages that link to "Item:Q1577468"
From MaRDI portal
The following pages link to A 1. 47-approximation for a preemptive single-machine scheduling problem (Q1577468):
Displayed 3 items.
- The power of \(\alpha\)-points in preemptive single machine scheduling. (Q1600001) (← links)
- Branch-and-bound method for minimizing the weighted completion time scheduling problem on a single machine with release dates (Q1761994) (← links)
- Preemptive scheduling with availability constraints to minimize total weighted completion times (Q1772973) (← links)