Pages that link to "Item:Q1599328"
From MaRDI portal
The following pages link to Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times (Q1599328):
Displaying 10 items.
- Scatter search with path relinking for the job shop with time lags and setup times (Q337556) (← links)
- Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time (Q613775) (← links)
- Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm (Q958545) (← links)
- Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times (Q964844) (← links)
- A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing (Q1730499) (← links)
- Multiobjective fuzzy mixed assembly line sequencing optimization model (Q2336200) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Scheduling job shop problems with sequence-dependent setup times (Q3055268) (← links)
- A scatter search approach to sequence-dependent setup times job shop scheduling (Q3055324) (← links)
- A genetic algorithm based approach for scheduling of jobs containing multiple orders in a three-machine flowshop (Q3163211) (← links)