Pages that link to "Item:Q1603328"
From MaRDI portal
The following pages link to Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling (Q1603328):
Displaying 5 items.
- A discrete particle swarm optimization for lot-streaming flowshop scheduling problem (Q933507) (← links)
- Queueing network analysis on dynamic lot streaming (Q954041) (← links)
- Two-machine flow shop scheduling with two criteria: maximum earliness and makespan (Q1877048) (← links)
- Earliness--tardiness production planning for just-in-time manufacturing: a unifying approach by goal programming (Q2432869) (← links)
- An Iterated Local Search Algorithm for the Lot-Streaming Flow Shop Scheduling Problem (Q5174415) (← links)