Pages that link to "Item:Q1607975"
From MaRDI portal
The following pages link to Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage (Q1607975):
Displaying 6 items.
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines (Q881563) (← links)
- Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility (Q1698061) (← links)
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time (Q1792653) (← links)
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches (Q2147068) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)