Pages that link to "Item:Q1617273"
From MaRDI portal
The following pages link to Two-stage hybrid flowshop scheduling with simultaneous processing machines (Q1617273):
Displaying 3 items.
- No-idle parallel-machine scheduling of unit-time jobs with a small number of distinct release dates and deadlines (Q2668758) (← links)
- A combined adaptive entropy‐TOPSIS and model predictive control strategy for mixed loading and delay operations in the reheating furnace (Q6081045) (← links)
- A systematic literature review on no-idle flow shop scheduling problem (Q6130678) (← links)