Pages that link to "Item:Q1622813"
From MaRDI portal
The following pages link to Setting optimal planned leadtimes in configure-to-order assembly systems (Q1622813):
Displaying 5 items.
- Optimisation model for multi-item multi-echelon supply chains with nested multi-level products (Q2029320) (← links)
- Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times (Q2160509) (← links)
- Push verse pull: inventory-leadtime tradeoff for managing system variability (Q2189921) (← links)
- Newsvendor equations for production networks (Q2294247) (← links)
- Optimal control policies for an inventory system with commitment lead time (Q5226164) (← links)