Pages that link to "Item:Q1628124"
From MaRDI portal
The following pages link to Constraint guided accelerated search for mixed blocking permutation flowshop scheduling (Q1628124):
Displayed 5 items.
- Scheduling blocking flowshops with setup times via constraint guided and accelerated local search (Q2003564) (← links)
- A new iterated greedy algorithm for no-idle permutation flowshop scheduling with the total tardiness criterion (Q2297561) (← links)
- Makespan preserving flowshop reengineering via blocking constraints (Q2329711) (← links)
- New idle time-based tie-breaking rules in heuristics for the permutation flowshop scheduling problems (Q2668784) (← links)
- Improved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilization (Q6094862) (← links)