Pages that link to "Item:Q1630186"
From MaRDI portal
The following pages link to Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates (Q1630186):
Displaying 5 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- On the exact solution of the no-wait flow shop problem with due date constraints (Q1652232) (← links)
- Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times (Q1735381) (← links)
- A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation (Q1998264) (← links)